User name R.A. Lindgren
Log entry time 16:02:17 on January30,2003
Entry number 93879
keyword=shift summary
Day Shift begins
Compton polarimeter DAQ crashed during OWL shift, Restarted at 8:30 am by JP
Continuing Runs 20627/1627/1568
stopped runs 20627/1627/1568 at 8:30 am
started runs 20628/1628/1569 Junk
Started runs 20629/1629/1570 at 8:35 AM
Stop runs 20629/1629/1570 at 8:59 AM
MCC adjusting source to get more QE
Restart Run
Start Runs 20630/1630/1571 at 9:00 AM
Stop Runs 20630/1630/1571 at 9:30 AM
Finished 5.5.5 kinematics 34K good events total
MCC repairing ARC,
Mark Stephens request Hall A access
Back to beam permit
Page Saha to make energy measurement when beam returns
Cates making polarization measurement 35.8%
Want 5 ua, no raster, no chicane
Waiting for beam tune.
12:15 Pulsed beam in Hall. okay
12:30 Tune CW beam in Hall
13:00 MCC reports an FSD from the compton polarimeter
End of run failed in Compton polarimeter
Sirish advises to put electron detector in garage
Can't remove from beam position. Error keeps popping up
Reboot Compton polarimeter slow controls: It doesn't help
13:15 Sirish on the way in.
14:20 The electron polarimeter detector is stuck in the beam line due to some hardware problem, which requires an access to repair. So in lieu of an access we and the run coordinator decided to forgo the energy measurement and continue to take data. MCC is tuning the beam through the chicane and Sirish is monitoring using the polarimeter. We expect to be back taking data shortly
15:00 Beam is tuned. Mask and raster beam. Stop the beam.
Put target in. Measure polarization 38.3 %
15:20 Start runs 20631/1631/1572
16:00 Shift change Continue the same run.