• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name Sulkosky

    Log entry time 23:14:56 on July14,2003

    Entry number 103839

    keyword=Hall A Tools

    I set the Left and Right Spectrometer momentum to 2.072 Gev/c and 2.136 GeV/c respectively. Right Q1 and the Septum are set to 0 Amps in preparation for the Hall A beamline test plan, which will check beam movement from the Septum and Right Q1.


    FIGURE 1