• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name jpchen

    Log entry time 05:19:32 on July23,2003

    Entry number 106305

    keyword=Target ladder dismounted

    We (Vince, Alexandre and J.P.) dismounted the target ladder with the targets.
    The pumping chamber was still there, but the target chamber of the cell was
    in tiny pieces. Reference cell had a small crack on the top center, it still held vacuum.
    To be sure, we will replace the reference cell as well. The middle 12C foil was gone and the two side foils were still there. Vince and Alexandre are preparing the reference cell now.

    The left side of the pick-up coil was loose and was moved when Radcon was doing
    decontamination of the scattering chamber.