• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name R. Feuerbach

    Log entry time 12:59:57 on July24,2003

    Entry number 106478

    keyword=Lengthened S2m ADC cables

    During the controlled access during beam studies, we replaced on the Left HRS the ADC signal cables from the splitter (on the detector) with longer cables, delaying the analog signal by an additional 20ns. This will make the analog signal arrive better-timed with the ADC gate.