• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name Z.-E. Meziani

    Log entry time 16:12:48 on July24,2003

    Entry number 106543

    keyword=Day shift summary

    Day shift starts

    8:07- run# 2736 single 12C -4% 1.2 M
    Daq crashed at the end of the previous run
    8:22-8:30 run# 2738 12 C multifoils -4% 1.23M
    8:30 Beam off
    9:00 Beam back
    9:03-9:08 run# 2739 Empty target -4% 1.2 M
    9:10 Asked for Raster on and 5 x 4
    Check spot with spot ++ found 3.5 x 3.5
    9:13-9:17 run# 2740 Empty target raster on 1.M
    Moving to reference cell N2 (102) psi
    9:29-9:33 run#2741 N2 reference cell -4% 1.M
    9:41-9:47 run#2742 Empty reference cell -4% 1.M
    9:50-9: run#2743 multifoils 12C -4% 1.2M
    10:07-10:15 run#2744 Single 12C foil -4% 1.1 M
    10:17 Moving to pol. He3
    10:21 -10:28 run # 2745 Pol. He3 -4% 1.2 M
    10:30 MCC took the beam back for beam studies.
    12:45 Mark Stevens set the trip level around 66 Amps for the septum,
    which fixed the problem of the owl shift guys.
    13:00 MCC is ready for beam back
    Javier Needed more time for the left arm
    13:40 Javier out and left spectrometer fixed.
    13:40 Jian Ping in the Hall to put the left spectrometer target
    13:54 Jian Ping out of the hall and asked MCC for beam back.
    14:05 Start acceptance studies
    14:09-14:15 run# 2746, empty target, collimator in (this is the correct coll. setting for this run not what's recorded in the comment of the run), raster on +3%: 1.2M
    14:16- 14:22 run#2747, empty target, collimator in, raster off: 1.0M
    14:25- 14:41 run#2748, Multifoils 12C, collimator in, raster off: 2.0M
    14:42 -14:55 run# 2749, Multifoils 12C, collimator in, raster on: 1.6 M
    New momentum setting 0%
    15:05-15:16 run#2750 Multifoils 12C, collimator in, raster on, 0%: 2M
    15:18-15:28 run#2751 Multifoils 12C, collimator in, raster off, 0%: 2M
    15:35-15:42 run#2752 empty target, coll. in raster off, 0%: 1.2 M
    (run#2752 elog comments are not correct. it is an empty target raster off, coll. in)
    15:45-15:49 run#2753 empty target, coll. in raster on, 0% : 1.1M
    run#2754 empty reference cell, coll. in, raster on: (stopped early)
    16:00-16:10run#2755 empty reference cell, coll. in, raster on: 2M
    Day shift ends