• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name Reitz

    Log entry time 08:15:20 on May24,2004

    Entry number 122660

    keyword=shift summary

    started with 5 uA unrastered beam on 4cm LH2
    and problems with BPMB (1HO3B)

    4:20: ramping down left HRS to 2.22GeV (septum at 205.53)
    RICH trips during the ramp down
    5:00 DAQ hangs up, TS1/TS0/ROC12/ROC16, 1101,1102 are junk
    8:15 Lambda 1116 finished, and day shift throws us out of
    the counting house



    1088 LH2/4cm raster off, 5uA, prescalers off, not much beam
    (some call it junk)
    1089 LH2/4cm raster off, 5uA, production 56K
    1090 LH2/4cm raster 2mm/2mm, 47uA, production 1.0M
    1091 LH2/4cm raster 2mm/2mm, 47uA, production 1.0M
    1092 LH2/4cm raster 2mm/2mm, 47uA, production 0.5M

    1093 RICH pedestal run (200Volts, no beam)

    1094 LH4/15cm raster 2mm/2mm, 12uA, production 1.0M
    1095 LH4/15cm raster 2mm/2mm, 12uA, production 1.0M
    1096 LH4/15cm raster 2mm/2mm, 12uA, production 1.0M
    1097 LH4/15cm raster 2mm/2mm, 12uA, production 1.0M
    1098 LH4/15cm raster 2mm/2mm, 12uA, production 1.0M
    1099 LH4/15cm raster 2mm/2mm, 12uA, production 1.0M

    Lambda 1116 production:

    1100 LH4/15cm raster 2mm/2mm, 15uA, production 1.0M
    1103 LH4/15cm raster 2mm/2mm, 15uA, production 1.0M
    1104 LH4/15cm raster 2mm/2mm, 15uA, production 1.0M
    1105 LH4/15cm raster 2mm/2mm, 15uA, production 1.0M
    1106 LH4/15cm raster 2mm/2mm, 15uA, production 1.0M
    1107 LH4/15cm raster 2mm/2mm, 15uA, production 1.0M
    1108 LH4/15cm raster 2mm/2mm, 15uA, production 1.0M
    1109 LH4/15cm raster 2mm/2mm, 15uA, production 1.0M
    1110 LH4/15cm raster 2mm/2mm, 15uA, production 1.0M
    1111 LH4/15cm raster 2mm/2mm, 15uA, production 1.0M