16:15 Arc energy measurement finished, Michelle starts testing
her script to test BCM linearity
17:00 tests done, moving to LH2 target
17:10 production 3022 IHWP OUT
18:00 MCC has problems with an IOC for the RF
19:17 Beam back
19:17 production 3023 IHWP OUT
raster++ checkout looks weird, notice that BPMs are not
updating -> when they switched to forced gain at 17:00
the settings were wrong -> runs 3022/3023 are junk
19:41 production 3024 IHWP OUT
20:40 production 3025 IHWP OUT
21:15 upper Coil of right septum reaches 7.8 K, we ask
MCC to decrease beam to 36.5 (from 37.0)
21:37 bleed through measurement -> 1% or 0.38uA
21:43 production 3026 IHWP OUT
22:30 Kent works on BCM linearity test,
run 3027 IHWP OUT
run 3028 IHWP OUT
23:12 back to production, run 3029 IHWP OUT
cont' into next shift