• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name finn

    Log entry time 18:39:59 on July25,2004

    Entry number 129657

    keyword=right speptum to full current, requesting beam

    right arm septum at full current, left arm getting close. nitrogen levels have recovered.

    checked out raster with 5uA size is 3 by 3
    increasing current to 36uA

    first run is 3149 : production in right arm only. IHWP i IN