• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name fieschi

    Log entry time 08:02:48 on October 5,2004

    Entry number 133034

    keyword=shift summary

    00:21 end run 3133

    00:21 start run 3134
    01:08 end run 3134

    01:11 start run 3135
    01.10 bleedthrough measurement : 0.75% (hall B off)

    01:41 end run 3135 Problem : Proton array HV off several channel
    try to turn all off and all on chassis 9 : it doesn't work

    rm : channel which tripped were all above 550V

    01:50 start run 3136 (50% PA blocks off)
    02:14 end run 3136 (50% PA blocks off)

    02:14 Problem fixed setting on all channel individually
    start run 3137

    02:52 end run 3137

    02:53 start run 3138
    03:32 end run 3138

    VDC problem on right bottom spectrometer : HV off

    03:45 start run 3139
    04:21 end run 3139

    04:26 start run 3140
    04:48 end run 3140

    no beam

    05:03 start run 3141
    05:48 end run 3141

    05:41 start run 3142
    06:21 end run 3142

    06:23 bleedthrough measurement 1.69%

    06:23 start run 3143
    07:16 Problem rate of T5 dropped from 50Hz to 30 Hz
    end run 3143
    reboot Roc 17 and restart CODA

    07:22 start run 3145
    08:00 end run 3145

    runlist
    _______________________
    DVCS

    -run 3133
    -run 3134
    -run 3135 HV problem at the end
    -run 3137
    -run 3138
    -run 3139
    -run 3140
    -run 3141
    -run 3142
    -run 3143 T5 low
    -run 3145


    FIGURE 1