User name A. Camsonne
Log entry time 00:10:56 on October 6,2004
Entry number 133102
keyword=Swing shift summary
Shift worker : X. Zheng
TO : Peter Monaghan
16:00 No beam, beam should resume at around 6PM but going to power permit
Calorimeter LED scan
Taking cosmics data
19:15 Beam into the hall on empty target, start checking beam properties
19:20 MCC has some RF problems beam delivery delayed for a couple of minutes
19:40 MCC working on the orbits
20:45 Beam into the hall, a bit off in Y position Y=2mm
20:50 beam steered to 1.4 mm in Y but beam unstable waiting to make
harp scan
20:20 beam looks good and is stable moving to LH2 target to make
two arms run
21:30 Moving to optics target
21:50 Moving back to 15cm LH2 target for DVCS data taking
while beam is unstable
22:40 RF lost in one part of the accelerator, no beam for at least
30 mins
Testing LED proton configuration... seems not to work...
23:05 Beam back
asked for Bleedthrough measurement but did not got it yet ( shift change I guess and beam unstable)
No Compton Data yet since beam was not very stable
Run summary
Harp scan 2024 2025
Two arm
Run 3178 3179 (optics)
DVCS
3180,3181,3185