    Log entry time 00:10:56 on October 6,2004

    Entry number 133102

    keyword=Swing shift summary

    Shift worker : X. Zheng
    TO : Peter Monaghan

    16:00 No beam, beam should resume at around 6PM but going to power permit

    Calorimeter LED scan

    Taking cosmics data

    19:15 Beam into the hall on empty target, start checking beam properties

    19:20 MCC has some RF problems beam delivery delayed for a couple of minutes

    19:40 MCC working on the orbits

    20:45 Beam into the hall, a bit off in Y position Y=2mm

    20:50 beam steered to 1.4 mm in Y but beam unstable waiting to make
    harp scan

    20:20 beam looks good and is stable moving to LH2 target to make
    two arms run

    21:30 Moving to optics target

    21:50 Moving back to 15cm LH2 target for DVCS data taking
    while beam is unstable

    22:40 RF lost in one part of the accelerator, no beam for at least
    30 mins
    Testing LED proton configuration... seems not to work...

    23:05 Beam back

    asked for Bleedthrough measurement but did not got it yet ( shift change I guess and beam unstable)

    No Compton Data yet since beam was not very stable



    Run summary
    Harp scan 2024 2025

    Two arm

    Run 3178 3179 (optics)

    DVCS
    3180,3181,3185