Main INDEX
Monthly INDEX
PREV
NEXT
User name dhayes
Log entry time 11:00:05 on October 8,2004
Entry number 133416
Followups:
keyword=results of PA gain change
There was an apparent cabling problem with tower 1 blocks 3,4,5 HV controls, to leave blocks 3 and 4 alone and change block 5 I had to leave Proton Array-2 channels 3 and 4 alone and change channel 2 (remember the blocks go 1-5, not 0-4) This caused a 5 minute delay and run 3304 was junk, but started run 3305 with correct values.
FIGURE 1
FIGURE 2