• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name M. Mazouz

    Log entry time 00:01:02 on October 9,2004

    Entry number 133488

    keyword=Shift summary

    Shift summary
    ---------------

    (15:33 - 16:20) Run 3313 / production (100k), LH2 target, I=2.5uA
    (16:21 - 16:50) Run 3314 / production (100k)
    (16:51 - 17:03) pedestal run and MUX test (A. Camsonne)
    (17:05 - 17:30) Led scan (C. Ferdi)

    17:35 : Ask MCC for 3 uA beam

    (17:37 - 18:03) Run 3321 / production (100k)
    (18:05 - 18:33) Run 3322 / production (100k)
    (18:35 - 19:01) Run 3323 / production (100k)
    (19:03 - 19:07) Run 3324 / TWOARM configuration run
    (19:11 - 19:15) Run 3325 / TWOARM config (with multi foil target)

    19:16: Back to LH2 Target. Ask MCC for a bleedthrough check (1.47%)

    (19:21 - 19:47) Run 3326 / production (100k)
    (19:48 - 20:05) Run 3327 / production (22k) daq problem during this run
    (20:13 - 21:38) Run 3329 / production (100k)
    (20:40 - 21:08) Run 3330 / production (100k)
    (21:09 - 21:35) Run 3331 / production (100k)

    21:15 : The light in the counting house disappears! Every thing still working well.
    21:50 : Light is back!!

    (21:36 - 22:04) Run 3332 / production (89k) ended because of no beam.
    (22:10 - 22:33) Run 3333 / production (100k)
    (22:34 - 22:59) Run 3334 / production (100k)
    (23:00 - 23:23) Run 3335 / production (86k) ended because of no beam.
    23:31 : Start of run 3336 / production