    Shift Summary
    ---------------
    00:20 : Target moved to LH2. Ask MCC for 3 uA.

    00:23 : Alex started MUX tests

    01:00 : MCC want a controlled access to the hall because of an alarm in the beam dump humidity detector.

    01:33 : beam is back. Continue MUX tests.

    02:06 - 03:16 : bad runs (3691-3694) with DVCSMUX configuration (PA HV, and Calo-PA pedestals not good for some blocs)

    03:30 - 04:35 : No beam because of optics problem in hall B. Pedestal run (3698) with DVCSPed configuration

    04:35 - 05:45 : Alex continues working on the MUX to fix pedestals problem.

    ------------------
    production runs LH2 target, I=3 uA, DVCSMUX configuration :

    05:23 - 05:58 : run 2709 (200k)
    05:58 - 06:31 : run 3710 (160k)
    06:31 - 07:13 : run 2711 (200k)
    07:30 - 07:48 : run 2714 (78k)

    ---------------------
    TWOARM runs 2712 and 2713 (optics target) (07:14 - 07:25)