    User name Carlos

    Log entry time 00:58:27 on October16,2004

    Entry number 134357

    keyword=Swing shift summary

    Shift crew:
    ------------
    Munoz Camacho
    Benaoum
    Monaghan

    Shift summary:
    ---------------
    16:00 Shift started with DVCS production in DVCSMux configuration.
    We realized the Cerenkov was not in the trigger for the DVCSMux config.

    16:22 First run (3742) with Cerenkov in the trigger.

    17:46 More detailed analysis of results with MUX was made. We took a regular DVCS run (without MUX), run 3746, in order to compare in exactly the same conditions. Results look good. We will come back to DVCSMux configuration and keep on it for the rest of the production (at least for this kinematics).

    18:25 Back to normal production (MUX and Cerenkov).

    19:50 Moved target to Optics in preparation for multifoil run. LED scan in progress.

    20:23 Optics run.

    20:27 Target back to 15cm-LH2. Two arms run: prescales were wrong (optics ones), so right-arm was highly prescaled.

    20:51 Back to production data. The transition was difficult (see halog entry).

    23:46 Two arms run again (previous one contained no data in RHRS).

    23:54 Back to production runs. This time the change of CODA configuration went without any problems. Everything should be ready for a quiet night...