    User name A. Camsonne

    Log entry time 11:34:01 on October21,2004

    Entry number 134869

    keyword=Beam studies finished setting up for Kinematic 3

    Beam studies are done
    Hall A is in controlled access
    I turned back the DVCS HV to take LED runs we will try to cure block 121 and check the effect of the light.
    Quads cycling has been started and dipoles are ramping up
    when survey will be done, Pierre and Jean-Marc will go down into the hall to move DVCS detector to 14.8 degres and check for interference with Left HRS when we move it to 23.91 degres