    Shift crew:
    ------------
    Munoz Camacho
    Ferdi
    Feuerbach

    Shift summary:
    ---------------
    00:00 Shift started with beam and running production.

    01:55 Bleedthrough measurement: 1.98%

    03:15 Asked MCC to adjust beam position in BPM4B-Y to 1.4 (was reading 1.1).

    04:30 MMC called. Magnets problems. Beam is expected to be quite unstable. Experts have been called. Beam pretty stable from 5am.

    05:54 Asked MMC to stop the beam in order to perform an LED run.

    06:34 Back to production running.