User name A. Camsonne
Log entry time 16:23:40 on November20,2004
Entry number 137188
keyword=Day shift summary
Shift crew :
SL A. Camsonne
TO F. Cusanno
3rd H. IBrahim
8:00 day shift begins. Right arm still ramping
11:00 Machine seems to have trouble trouble delivering beam to Hall A. MCC people are trying to find what the problem is.
11:40 Beam is back but MCC still has problems with the controls
12:01 MCC want to send tune beam in Hall. Stopping run
4854 at 97k events.
12:10 Turned regulator on right arm
12:14 4 uA in hall starting run even though MCC has not called to tell tune was done.
Run 4855 has unstable beam
12:55 Called MCC to have an update, they are still working on their problems but beam seems stable enough to take data.
13:13 Two arm run
13:23 Moved to optics target : optics run
13:32 Moved back to 15 cm LD2
13:34 Bleedthrough 0.32 %
13:45 Hall B ask for 10 minutes of Hall A and C off to calibrate their tagger. I accepted as long as it does not go over 10 minutes.
14:13 Beam off for Hall B
14:44 Beam ready to come back (it took more than 10 minutes...)
15:51 MCC called Hall B is complaining about the beam quality
MCC will investigate they estimate it to about 30 minutes without beam when they start.
Run list
Two arm
4856 200k
Optics
4857 200k
DVCS pedestal
4859
Production
Run Events Charge Dead time
4850 298791 0.01038 36.76
4851 298656 0.009511 33.32
4852 298671 0.009534 32.22
4853 236112 0.007521 18.01
4854 96489 0.003067 25.35
4855 298705 0.009565 29.19
4858 242637 0.007781 23.66
4860 298397 0.01121 36.98
Compton list
9611 Pol:75.15%+-1.229% S/N 14.3
9612 Pol:73.7%+-1.385% S/N 15.7
Trip list
8:00-9:00 14 = 5 mins
9:00-10:00 17 = 6 mins
10:00-11:00 11 = 3 mins
11:00-12:00 17 = 6 mins
12:00-13:00 21 = 7 mins
13:00-14:00 13 = 4 mins
14:00-15:00 6 = 2mins
15:00-16:00 12 = 4 mins