Main INDEX
Monthly INDEX
PREV
NEXT
User name Annand
Log entry time 23:58:56 on February 1,2005
Entry number 140573
keyword=Shift Summary
Gen Test N20 + HRSL
p(e,e'p), d(e,e'n) etc.
17.15 Cryo Target restored
17.15 HRS L Q2,Q3 PSU trip Hall-A access to reset PSU, cycle magnets
18.10 2uA beam...BigBite rates rather high, around 1 MHz
Turn off BB HV after screen grab of rates
18.40 Increase to 10uA on 15cm LH2 nominal 2.5x2.5mm raster
spot++ gives approx 2.0x1.5mm (x,y) at target
20.25 Change to 4cm LH2
21.40 Change to 4cm LD2
22.45 Change HRSL angle to 21 deg, Pe 3.485
23.25 Change to 4cm LH2, 10uA
E0 = 4.627 GeV
p(e,e'p) d(e,e'N) 3-position scan N across N20
central Pe=3,364 Th_e=22.5 deg 4cm LH2,LD2
+ Pe=3.204 Th_e=24.5 deg 4cm LH2...see next shift
- Pe=3.485 Th_e=21.0 deg 4cm LH2
2277 15cm LH2,2uA Pe=3.364 GeV, Theta_e/p=22.5/40.3 deg, 3.5M ev
2278 15cm LH2,2uA Pe=3.364 GeV, Theta_e/p=22.5/40.3 deg, 600k ev
2279 15cm LH2,10uA Pe=3.364 GeV, Theta_e/p=22.5/40.3 deg, 1M ev
2280 15cm LH2,10uA Pe=3.364 GeV, Theta_e/p=22.5/40.3 deg, 328k ev
2281 4cm LH2,10uA Pe=3.364 GeV, Theta_e/p=22.5/40.3 deg, 520k ev
2282 4cm LD2,5uA Pe=3.364 GeV, Theta_e/N=22.5/40.3 deg, 337k ev
2283 Empty 20uA while HRSL field changed, Theta_e=21.0deg, 14k ev
2284 4cm LH2,10uA Pe=3.485 GeV, Theta_e=21.0 deg