• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name Markowitz

    Log entry time 03:35:51 on March23,2005

    Entry number 142237

    keyword=tech called in for Q2

    Q2 continued to fault on overtemperature, after 5-10 minutes. We finally called in the tech-on-call (Ed Folts) who was able to improved air cooling for the power supply racks. The entire Q2 down time was almost 4 hours.