• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name jpchen/ameya

    Log entry time 03:35:03 on August 1,2005

    Entry number 150264

    keyword=Target re-fill and cooled down.

    The Helium target vented around 1:45 am, when the CHL flow dropped to 18 g/s (beam was taken away but not quick enough).
    With controlled access, we closed the vent valve. Changed a helium bottle and refill and cooled down the target. The target now is at 6.7K and 207 psi, Fan 60 Hz.