Main INDEX
Monthly INDEX
PREV
NEXT
User name jpchen/ameya
Log entry time 03:35:03 on August 1,2005
Entry number 150264
keyword=Target re-fill and cooled down.
The Helium target vented around 1:45 am, when the CHL flow dropped to 18 g/s (beam was taken away but not quick enough).
With controlled access, we closed the vent valve. Changed a helium bottle and refill and cooled down the target. The target now is at 6.7K and 207 psi, Fan 60 Hz.