NEXT
User name lkaufman
Log entry time 16:01:47 on August22,2005
Entry number 152901
keyword=Day Shift Summary
Day Shift Summary
----------------------
08:00 - production running
10:30 - power glitch caused all quads and sweeper to trip
10:55 - sweeper already back up
11:00 - went to controlled access to reset the quads
- JP Chen also went to the hall to check the vacuum gauge on the target
11:35 - magnets finished ramping up, waiting for beam
- checked raster w/ 5 uA beam, 4.5x2.2
11:44 - started production again
12:15 - energy lock back on Hall A
13:35 - flippered IHWP to OUT
13:40 - started new Compton run
- Compton run 11947, polarization = 84 %
15:45 - MCC called to say that there is no beam due to a vacuum fault in 1L13
- they have no time estimate at the moment
SUMMARY of RUNS
-----------------
4628: production, IHWP IN, 42.6k pairs
4629: production, IHWP IN, 41.2k pairs
4630: production, IHWP IN, 38.6k pairs
4631: production, IHWP IN, 23.4k pairs
4632: pedestal run
4633: production, IHWP IN, 26.2k pairs
4634: production, IHWP IN, 42.0k pairs
4635: production, IHWP OUT, 43.4k pairs
4636: production, IHWP OUT, 32.7 pairs
4637: profile scan
4638: started as production, but mostly pedstal, passed to swing shift