    User name R. Michaels

    Log entry time 16:39:40 on September 1,2005

    Entry number 154138

    keyword=Low I cavity commis. part 2


    Current ... HAPPEX ... Spectr ..... Upstream ....... Downstream
    .. uA ....... run .... run ......BCM ... X ... Y .... BCM ... X ... Y

    ... 36 ...... 4913 ... 2598 ..... 11 ... 9 ... 9 .... 11 .... 9 ... 9
    .... 1 ...... 4914 ... 2599 ..... all 15
    Arne Freyberger realizes we need to reduce post-gain.
    The X,Y are saturating.
    15:20 We turn off raster.
    .... 1 ...... 4915 ... 2600 ... all pregains 15. all post 18000
    .... 1 ...... 4916 ... 2601 ... short run, junk
    Realized dithering was on. Turned it off.
    Next we will do a run during which we scan X,Y over a box.
    At each corner of the box (size +/- 2mm) we pause for 3 minutes
    Online it looks like stripline EPICs tracks cavities PC104. Good!
    .... 1 ...... 4917 .... 2602 ... Box scan
    Arne says the cavities saturate at 2 mm at one corner. So during
    the above box scan, MCC reduces the scan to about 1 mm box size.
    --
    Next we will go for 50 nA using Hall B slits (gives fine control
    of nA beam and is how we'll do low-I in Sept).
    The striplines probably won't work. Arne adjusts gain from MCC.
    Waiting ... ACC problems ... so I leave this for the swing shift.
    After Arne makes his adjustments we'll need to:
    1. Record the parameters (gains/phases).
    2. Do a box scan using the known amplitude on steering coil.
    3. Return to production.