User name R. Michaels
Log entry time 16:39:40 on September 1,2005
Entry number 154138
keyword=Low I cavity commis. part 2
Current ... HAPPEX ... Spectr ..... Upstream ....... Downstream
.. uA ....... run .... run ......BCM ... X ... Y .... BCM ... X ... Y
... 36 ...... 4913 ... 2598 ..... 11 ... 9 ... 9 .... 11 .... 9 ... 9
.... 1 ...... 4914 ... 2599 ..... all 15
Arne Freyberger realizes we need to reduce post-gain.
The X,Y are saturating.
15:20 We turn off raster.
.... 1 ...... 4915 ... 2600 ... all pregains 15. all post 18000
.... 1 ...... 4916 ... 2601 ... short run, junk
Realized dithering was on. Turned it off.
Next we will do a run during which we scan X,Y over a box.
At each corner of the box (size +/- 2mm) we pause for 3 minutes
Online it looks like stripline EPICs tracks cavities PC104. Good!
.... 1 ...... 4917 .... 2602 ... Box scan
Arne says the cavities saturate at 2 mm at one corner. So during
the above box scan, MCC reduces the scan to about 1 mm box size.
--
Next we will go for 50 nA using Hall B slits (gives fine control
of nA beam and is how we'll do low-I in Sept).
The striplines probably won't work. Arne adjusts gain from MCC.
Waiting ... ACC problems ... so I leave this for the swing shift.
After Arne makes his adjustments we'll need to:
1. Record the parameters (gains/phases).
2. Do a box scan using the known amplitude on steering coil.
3. Return to production.