Log entry time 20:06:00 on March 1,2006
Entry number 164675
keyword=Day Shift Report
Day Shift Summary
8:00 NMR measurement, 40%
8:27-8:50 Beam position studies in empty position (0.6 uA, raster off). Results show no DC trips.
8:50-9:00 Beams position studies in pol. 3He position (0.6 uA, raster on). DC trips in all measured positions except nominal "center" position.
9:00 Beam off for beam studies. Access for laser work and to check flow on helium bags.
13:00 Beam being restored.
13:30-14:40 Beam position/rate studies using all targets with raster on.
15:00-16:00 Beam quality measurements using HARP, Compton, Synchrotron measurements.