User name A. Puckett
Log entry time 00:12:03 on March14,2006
Entry number 166563
keyword=swing shift summary
Shift Leader: A. Puckett
Target Operator: J. Miller
16:06 - Took over from day shift. Production running is going smoothly. Current run # is 2937. At 18:25 we took away beam for an NMR polarization measurement. Result is 39.8%. At 18:37 we took the beam back at 7 muA, resumed production running. Hall B asks to do IHWP change, expect this to take place at about 23:45.
Half-wave plate change takes place at 23:45. Bogdan wants to do HV change, down for a few minutes after IHWP change
Production Runs
Run # Start Stop Nevents Replay OK?
2937 15:37 16:59 3M Y
2938 17:00 18:24 3M Y
2939 18:35 19:57 3M Y
2940 19:57 20:51 2M Y
2941 20:51 21:49 2M Y
2942 21:50 22:44 2M Y
2943 22:44 23:39 2M Y
2944 23:56
Compton Runs: (Start/Stop times are in Compton time, not necessarily the same as HALOG time)
Run # Start Stop S/N Pe*Pg Replay OK?
13084 13:56 16:03 12.5 82.6 Y
13085 16:07 18:15 22.5 83.6 Y
13086 18:18 20:25 21.7 88.7 Y
13087 20:34 22:40 26.4 82.8 Y
13088 22:48 23:43 21.6 76.0 Last few minutes were after 1/2 wave plate change, re-analyze by expert?
13089 00:03
Parity Runs:
Run # Start Stop N Aq
7074 16:32 18:25 200K 1.679
7075 18:37 23:19 500K -1.772
7076 23:52