User name cusanno
Log entry time 08:00:24 on March15,2006
Entry number 166756
keyword=Owl Shift Summary
Shift begins in the middle of changes: new DC voltages, CODA crash, target on way of restoring.
00:50 - we set and check the new DC voltages and restored DAQ (ROC23 reboot).
Run 2979 is test of new DC HV setting, ps2=50, ps3=1
01:45 - NMR measurements.
Some troubles during measurement, we called Ameya.
02:05 - Polarization is well above 30% (HALOG 166718), so we switch to production.
Compton background is still not so good.
02:30 - Justin noticed raster size smaller than 2 mm x 2 mm. Asked MCC to have larger raster.
Now MCC is working with 4.5 x 4.5 and presently this give us
2 mm x 2 mm at target position as desired.
SLI shows energy spread around 1.3 x 10-4, MCC says they can not do much better for the night.
May it be related to the Compton background in some way?
04:00 - Noticed that raster is still slightly smaller than 2 mm in x direction, we asked MCC to have 5 x 5.
04:29 - Beam away for three minutes due to cavity problems.
05:25 - NMR measurement performed
07:00 - Stop production, beam away for beam studies.
No more beam at least until the afternoon.
07:20 - Controlled Access
Shift end in controlled access.
production run:
2980, 670 k events, ended to check raster size
2981, 2M events
2982, 2M events
2983, 850k events. ended because beam away
2984, 2 M events
2985 - JUNK - NMR measurement needed
2986, 2M events
2987, 2M events
2988, 106k events, ended because beam is away for beam studies