User name cusanno
Log entry time 08:02:01 on March18,2006
Entry number 167265
keyword=Owl Shift Summary
Shift started just after production was restored. Something bad in the beam charge asymmetry. Bob Michaels came in to look at it.
Furthermore there are still some problems with T3 efficiency, due to timing as far as I understand.
00:50 - Qasy feedback restarted. Beam charge asymmetry now looks fine.
01:11 - testing T3 efficiency
01:35 - switch back to standard production
02:10 - NMR measurement performed
03:10 - some minor problems with DAQ. One-run test at 0.5 uA, ps2=1000000, then switch back to production, ps2=60.
04:51 - CODA problems, same as before: end-of-run failed, start-run not working. ROCs and CODA components all rebooted.
We take chance to do NMR measurement, scheduled at 5.
After Bob "repair", beam charge asymmetry was always in the specifications (<50 ppm), as well as SLI, always around 8 x 10-5
Production run:
3100, 1M events, undestanding Beam Charge Asymmetry, first run after switching in (temptative) production
3101, 1M events
3102, 930k events, Qasy feedback rebooted at the end
3103, 930k events, Beam Charge Asymmetry OK, but still checking T3
3104, 1M events, ps1=100000, ps2=1000, ps3=1, T3 check
3105, 1M events, ps1=100000, ps2=60, ps3=1, standard production
3106, 1M events
3107, 1M events
3108, 450k events, ended to to test al low current
3109 JUNK
3110, 50 k events, test at 0.5 uA, ps2= one million
3111, 1 M events, back to production
3112, 1 M events
3113, 1 M events
3114, 160 k events, ended to check raster size
3115, 1M events, end-of-run failed
3116 JUNK
3117, 1M events
3118, 1M events
3119, 1M events
3120, 1M events
3121, 1M events
3122, 1M events
3123, 1M events
3124, 1M events
3125, 1M events