• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name Armando Acha

    Log entry time 08:03:43 on May 6,2006

    Entry number 173162

    keyword=Owl Shift Summary

    OWL Shift Summary:

    SL: Armando Acha.
    TO: Salvatore Frullani.


    PRODUCTION (3He):
    *Runs are started as soon previous ones are done unless something else mentioned.


    00:05 Run 4494 ongoing. 3M events. Finished at 00:51.
    00:52 Half wave plate changed from IN to OUT. Coordinated with Hall B.
    00:53 NMR measurement. 53.4%.
    01:07 Run 4495 started. 3M events.
    02:06 Run 4496 started. 3M events.
    03:04 Parity run 7625 started.
    03:05 Run 4497 started. 3M events.
    04:10 Run 4498 started. stopped at 04:50. 2.2M events. ROC 3 crashed. CODA is rebooted. BB Crate FastBus CPU (bbfsi3) reseted.
    04:55 Run 4499 started. PS2 changed from 54 to 50 to keep the rate closer to 50 Hz. 3M events.
    05:57 Run 4500 started. stopped at 06:55.
    06:56 NMR measurement. 53.3%.
    07:07 Run 4501 started. Ongoing.
    07:45 Parity run 7626 started.

    Quite productive shift. Almost 23M events.