Main INDEX
Monthly INDEX
PREV
NEXT
User name Armando Acha
Log entry time 08:03:43 on May 6,2006
Entry number 173162
keyword=Owl Shift Summary
OWL Shift Summary:
SL: Armando Acha.
TO: Salvatore Frullani.
PRODUCTION (3He):
*Runs are started as soon previous ones are done unless something else mentioned.
00:05 Run 4494 ongoing. 3M events. Finished at 00:51.
00:52 Half wave plate changed from IN to OUT. Coordinated with Hall B.
00:53 NMR measurement. 53.4%.
01:07 Run 4495 started. 3M events.
02:06 Run 4496 started. 3M events.
03:04 Parity run 7625 started.
03:05 Run 4497 started. 3M events.
04:10 Run 4498 started. stopped at 04:50. 2.2M events. ROC 3 crashed. CODA is rebooted. BB Crate FastBus CPU (bbfsi3) reseted.
04:55 Run 4499 started. PS2 changed from 54 to 50 to keep the rate closer to 50 Hz. 3M events.
05:57 Run 4500 started. stopped at 06:55.
06:56 NMR measurement. 53.3%.
07:07 Run 4501 started. Ongoing.
07:45 Parity run 7626 started.
Quite productive shift. Almost 23M events.