• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name gilman

    Log entry time 08:40:35 on July18,2006

    Entry number 174388

    keyword=FPP LV status

    I noticed supply 10a read back low for ch 1. As a guess, the cable got pushed a little during the chamber 2 de-installation / csr test crystal installation. I went downstairs and tweaked it, and turned the supply off and on, and now it is fine. Note that chamber 2 is off, and supplies 7 and 9 are off, and cables are disconnected, but somehow ``significant'' voltages are read back. Oh well.


    FIGURE 1