• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name jpchen

    Log entry time 10:08:04 on July26,2006

    Entry number 175351

    keyword=CSR test completed

    We got 20 uA near the end when Hall C was down. Beam stopped at 10 am.
    CSR test got 5 kin point (reduced from the original 17 kin points) at 90 degree, and got two kin points at 120 degree (also reduced from
    the orginial 17 kin points). These should give us reasonable set of data for the study of background and test the needs of the new CSR detectors.


    FIGURE 1