• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name eschulte

    Log entry time 23:55:39 on August 02, 2006

    Entry number 177020

    keyword=Swing Shift Run Numbers & Events

    Run # Events Total Current Radiator Target
    2024 2 M 2 M 12uA 4% 15cm LD2
    2025 2 M 4 M 12uA 4% 15cm LD2
    2026 2 M 6 M 15uA 4% 15cm LD2
    2027 2 M 8 M 15uA 4% 15cm LD2
    (Run 2027 effected by beam position drift of up to 1 mm.
    MCC is working on the FFB.)
    2028 1.95 M 9.95 M 15uA 4% 15cm LD2
    (Run 2028 effected by beam position drift of up to 1 mm.
    MCC is working on the FFB.)

    2031 2 M 11.95 M 15uA 4% 15cm LD2
    2032 2 M 13.95 M 15uA 4% 15cm LD2
    2033 1.6 M 15.55 M 15uA 4% 15cm LD2
    2034 2 M 17.55 M 15uA 4% 15cm LD2
    2035 2 M 19.55 M 15uA 4% 15cm LD2
    ===================================================================
    2036 2 M 2 M 20uA out 15cm LD2
    2037 2 M 4 M 20uA out 15cm LD2
    2038 2 M 6 M 20uA out 15cm LD2
    2039 0.8M 6.8M 20uA out 15cm LD2
    2040 2 M 8.8M 20uA out 15cm LD2
    2041 0.5 9.3M 20uA out 15cm LD2
    ===================================================================