Main INDEX
Monthly INDEX
PREV
NEXT
User name eschulte
Log entry time 23:55:39 on August 02, 2006
Entry number 177020
keyword=Swing Shift Run Numbers & Events
Run # Events Total Current Radiator Target
2024 2 M 2 M 12uA 4% 15cm LD2
2025 2 M 4 M 12uA 4% 15cm LD2
2026 2 M 6 M 15uA 4% 15cm LD2
2027 2 M 8 M 15uA 4% 15cm LD2
(Run 2027 effected by beam position drift of up to 1 mm.
MCC is working on the FFB.)
2028 1.95 M 9.95 M 15uA 4% 15cm LD2
(Run 2028 effected by beam position drift of up to 1 mm.
MCC is working on the FFB.)
2031 2 M 11.95 M 15uA 4% 15cm LD2
2032 2 M 13.95 M 15uA 4% 15cm LD2
2033 1.6 M 15.55 M 15uA 4% 15cm LD2
2034 2 M 17.55 M 15uA 4% 15cm LD2
2035 2 M 19.55 M 15uA 4% 15cm LD2
===================================================================
2036 2 M 2 M 20uA out 15cm LD2
2037 2 M 4 M 20uA out 15cm LD2
2038 2 M 6 M 20uA out 15cm LD2
2039 0.8M 6.8M 20uA out 15cm LD2
2040 2 M 8.8M 20uA out 15cm LD2
2041 0.5 9.3M 20uA out 15cm LD2
===================================================================