Main INDEX
Monthly INDEX
PREV
NEXT
User name rousseau
Log entry time 01:49:20 on August 03, 2006
Entry number 177033
This entry is a followup to: 176833
keyword=runs summary (owl shift 2 august 06)
beam's back at 1.50
runs 1985-1990 : target LD2, radiator 4%
radiator moved out
target changed to optics
beam 20 microA
run 1991 : C optics
spectrometer moved to 73.26, momentum changed to 0.5857 (computer didn't
respond, need to reboot the ioc and change the value of the current on
the D magnet to 196.1A)
run 1992 : C optics
run 1993 : 4cm dummy
run 1994 : 15cm dummy
run 1995 : tantalum
target moved to LH2, beam 15microA, radiator moved in 4%
run 1996 : LH2
radiator moved out, beam 20microA
run 1997 : LH2
run 1998 : LD2
beam 12microA, radiator in 4%
run 1999 : LD2
production begins
run 2000-2003 : LD2, in 4%, 12 microA
run 2004 in progress