Main INDEX
Monthly INDEX
PREV
NEXT
User name Spiegel
Log entry time 11:43:24 on August 17, 2006
Entry number 180524
keyword=Bogie Repair
Mark and I performed a follow-up diagnosis of the bogie failure from
yesterday. Mark re-connected the drive coupling while I replaced the
motor encoder. Tested drive system in CW and CCW directions for 2 degrees
of traval. Everything worked smoothly. Re-postioned LEFT spectometer to
92.831
degrees.
A copy of this log entry has been emailed to: kees@jlab.org,stevensm@jlab.org