Log entry time 16:01:36 on October31,2006
Entry number 188638
keyword=Day shift summary
Shift workers: J. P. Chen (SL), B. Norum (TO).
8:00-8:30 production, 85 uA on He4.
8:30 beam off for beam study. Hall A to restricted access
for spectrometer survey, which is expected to take 5-6 hours.
At the meantime, Hall A techs working on the spectrometer
controls; Bob and Alexandre working on Compton stuff.
2:30 pm Around 2 pm Survey was completed. MCC is going to be ready by 2:30-3:00. Hall A techs will need more time to wrap up things,
by maybe 5 pm.
3:30 pm Hall A techs finished their work. Ed Folts requested MCC
to send ARMS to do sweep. We are setting magnets back to the proper values.
4:00 pm All quads are set. Only Right dipole is still going up and left dipole is settling down.
run 1866 7:29-8:15, 85 uA on He4, 1M.
run 1867 8:15-8:32, 85 uA on He4, 309K.