    User name bogdanw

    Log entry time 16:05:37 on December 2,2006

    Entry number 189797

    keyword=shift summary

    Previous shift reported a problem of missing TDC for S2L.
    Took acccess, connected second output of the active delay
    box to the scaler through the LT.
    Found very low rate on all channels. After search for missing
    signal had reconnect a flat cable joint as result the signals
    on output appear back.

    run 1222, 9:55-10:26 530k events on LH2
    run 1223, 9:34-11:16 100k events on Al
    set parameters for "ep 2" kinematic
    problem with HRS-R dipole - Hall probe readout
    put C-12 target to resolve question of qelastic ep
    change ruster size: MCC set 3.5x3.5; we observe 2x2
    run 1224, 12:43-13:16 150k events on C-12 single foil
    run 1225, 13:23-13:53 743k events on LH2 target
    run 1226, 14:03-14:15 134k events on Al target
    access for Hall probe reboot, change to kinematic "ep 3"
    run 1227, 15:04-15:22 162k events on Al target
    run 1228, 15:28- on LH2 target