keyword=shift summary
Previous shift reported a problem of missing TDC for S2L.
Took acccess, connected second output of the active delay
box to the scaler through the LT.
Found very low rate on all channels. After search for missing
signal had reconnect a flat cable joint as result the signals
on output appear back.
run 1222, 9:55-10:26 530k events on LH2
run 1223, 9:34-11:16 100k events on Al
set parameters for "ep 2" kinematic
problem with HRS-R dipole - Hall probe readout
put C-12 target to resolve question of qelastic ep
change ruster size: MCC set 3.5x3.5; we observe 2x2
run 1224, 12:43-13:16 150k events on C-12 single foil
run 1225, 13:23-13:53 743k events on LH2 target
run 1226, 14:03-14:15 134k events on Al target
access for Hall probe reboot, change to kinematic "ep 3"
run 1227, 15:04-15:22 162k events on Al target
run 1228, 15:28- on LH2 target