    02/10/07 0000-0800
    Experiment #: E05-004
    Shift Leader: E. Schulte
    Shift Workers: A. Kelleher

    00000100020003000400050006000700Total Time
    Acceptable Beam
    in Use
    0.270.650.590.700.860.980.640.975.66
    Beam Available
    but Not in Use
    0.700.260.370.250.090.020.270.001.96
    Beam Not Available
    or Unacceptable
    0.030.080.030.050.050.000.080.030.35
    Accelerator Con-
    figuration Change
    0.000.000.000.000.000.000.000.000.00
    Experiment
    Ready
    0.300.750.620.750.921.000.731.006.07
    Planned Config-
    uration Change
    0.000.000.000.000.080.000.270.000.35
    Unplanned
    Experiment Down
    0.700.250.370.250.000.000.000.001.57
    Hall not
    ready reasons
    Target0.000.250.370.250.000.000.000.000.87
    Data Acq0.000.000.000.000.000.000.000.000.00
    Other0.700.000.000.000.000.000.000.000.70
    HRSL0.000.000.000.000.000.000.000.000.00
    HRSR0.000.000.000.000.000.000.000.000.00
    HALL_OFF0.000.000.000.000.000.000.000.000.00

    Comments: 00:00 Raster not working quite right. Spent about 45 minutes trying to fix it & understanding why the lituium target data doesn't look "right". 00:46 Restarted taking data with C target @ uA. 01:40 changed to Li target (#5) asked for 2uA. 01:45 changed back to C target with recurrence of raster problem. 01:54 request change to "empty" to test raster problem vs. target position hypothesis. 03:50 After about 2 hours of study we have determined that the lithium target is inappropriately encoded. Resumed running with carbon target, 5uA beam current, 3x3 raster @ target 04:43 Switch targets to tantalum for Ta production running. 06:12 Changed to boron carbide target 06:44 Lowered beam current to 1uA.

    Data Entry by: E. Schulte