Main INDEX
Monthly INDEX
PREV
NEXT
User name brads
Log entry time 20:00:58 on February 17, 2007
Entry number 193894
This entry is a followup to: 193870
keyword=Maximum 45 minutes per run (starting with Kinematics I)
In order to make sure we get some data at all of our points we are going
to limit ourselves to a MAXIMUM of 45 minutes per run starting with
Kinematics I (61.0 degrees).
This should allow each shift to safely get through 4 targets including
downtime for target changes, angle changes, machine glitches.
Here is a list of the recommended currents for each target (Ta has been
bumped up, Carbon dropped down from the previous run plan):
- Tantalum 22 uA Raster: 1.5x2 (MCC: 10x2)
- Carbon 10 uA Raster: 1.5x2 (MCC: 10x2)
- Boron 4 uA Raster: 1.5x2 (MCC: 10x2)
- Lithium 5 uA Raster: 1.5x2 (MCC: 10x2)
A copy of this log entry has been emailed to: kwang@jlab.org, rsubedi@jlab.org, puckett@jlab.org, mjona@jlab.org