Calorimeter Run Procedure
1. Call MCC and request a Calorimeter run for ___ uA.
a) Tell them they _must_ call you back and ask you to start logging
_before_ they deliver beam onto the calorimeter slug.
2. When MCC should set up for the requested current then call you and ask
that you start logging:
a) Start the DVM logging (Hall A Main Menu: BCM: BCM Logging)
- NOTE: The BCM run number will not increment until after you stop
the logging.
b) Start your CODA runs. Change the run type in the Start-Run pop-up
to "BCM Calibration".
3. Watch the beam current monitor. You should see it go from zero to the
requested current. The run should take roughly 5--10 minutes. MCC
should call
when it's over.
4. MCC will call and tell you it is over. If the current goes to zero
and MCC
has not called after a few minutes, call them and confirm that the
Calorimeter
run was successful. Then
a) Stop the DVM logging and note the run number (ie: BcmLog_XXX )
b) Stop the CODA runs and note the run numbers
5. Make a HALOG entry titled 'Calorimeter run: XXX uA' that lists the files
from 4(a) and 4(b).
5. Continue with the regular program.
a) change the run type back to "Production" (or whatever you're doing)
b) do a raster++ check as soon as beam comes back