    Owl Shift for Tuesday May 1st, 2007


    Leader:   Bryan Moffit
    Target:   Elena Khrosinkova
    Beam Energy = 4.501 GeV
    Left arm: Angle = 21.546° p0 = 3.728 GeV/c
    Right arm: Angle = 68.328° p0 = 0.727 GeV/c

    Summary

    Fairly smooth production data taking. Lost about 3 hours of beam due to accelerator down.

    Significant Events

    • 00:00 Began shift in the middle of Run 3038 on the Al dummy target 40µA.
    • 00:25 MCC calls to inform us that there's some trouble with a cavity in the NL. Beam will be away for awhile.
    • 00:35 Slight "tweak" to left arm p0.
    • 01:25 Update from MCC.. expert is in, still working on the delivery problem.
    • 02:33 Update from MCC.. they think they fixed things. Could be another half hour before we have CW in the Hall.
    • 03:30 MCC begins sending Tune beam... then CW 1 minute later.
    • 04:38 Move to 4He target.
    • 08:00 Passed Run 3049 to Day shift.

    Data Run Summary

    • 00:00 Run 3038 - Background Run (Al Dummy)
    • 00:27 Run 3039 - Pedestal Run
    • 02:35 Run 3040 - Pedestal Run
    • 03:34 Run 3041 - Background Run (Al Dummy). "Forgot to return the stupid pedestals." - Elena
    • 03:59 Run 3042 - Background Run (Al Dummy)
    • 04:54 Run 3043 - Production Run (4He)
    • 05:21 Run 3044 - Production Run (4He)
    • 05:50 Run 3045 - Production Run (4He)
    • 06:19 Run 3046 - Production Run (4He)
    • 07:00 Run 3047 - Production Run (4He)
    • 07:28 Run 3048 - Production Run (4He)
    • 08:00 Run 3049 - Production Run (4He)