    User name LeRose

    Log entry time 16:02:36 on May 09, 2007

    Entry number 201484

    keyword=Shift Summary

    Shift Summary 5/9/2007
    John LeRose (SL)
    Lingyan Zhu (TO)

    At start of shift no beam
    Accelerator planning to do beam studies starting at 08:30
    10:55 Jack Segal makes opportunistic controlled access to check ARC HV
    Jennifer Williams takes some air samples too.
    Right dipole constant measured to be 18.561 minutes (no significant change)
    Magnets shut down during ESR work then restored (quads were cycled)
    14:23 We are out of controlled access
    15:00 MCC says at least another hour (Folts and others go back into the Hall)
    16:00 Waiting for beam (MCC says they're ready when the AES and RADCON
    people leave the Hall)

    No beam the whole shift!