User name kelleher
Log entry time 00:01:23 on May 15, 2007
Entry number 202074
keyword=Swing Shift Summary
Monday, May 14 Swing Shift
Plan: start up after energy change
16:00 Swing Shift started in controlled access.
16:46 Brad Sawatzky (RC) called, gave him an update on the hall work --
Left magnets seem to be set correcly, but the right spectrometer is not
in the correct location.
16:52 MCC called, we will most likely not have physics beam until after 20:00
17:48 Spectrometer moved successfully, techs exit the hall. Told MCC we
are ready for beam
17:55 MCC called, the detector hut door for the left spectrometer is not
closed. Jack headed down to close the door.
18:02 Door is shut, gone to power permit
18:23 Back into the hall, bogies right not working again.
18:51 Set HV to 72% of MAX
19:30 Right Q2 tripped, Jack Segal was still around, so he is investigating.
20:39 Can set Q2 by hand, but not remotely. Jack Segal is going
downstairs to set the Q2 current manually.
21:12 Current set manually. Back to beam permit.
23:14 Called to ask about beam delivery -- crew chief will call back
Run Summary
Run Begin End Notes
-----------------------------------
no beam