    User name kelleher

    Log entry time 00:01:23 on May 15, 2007

    Entry number 202074

    keyword=Swing Shift Summary

    Monday, May 14 Swing Shift

    Plan: start up after energy change

    16:00 Swing Shift started in controlled access.
    16:46 Brad Sawatzky (RC) called, gave him an update on the hall work --
    Left magnets seem to be set correcly, but the right spectrometer is not
    in the correct location.
    16:52 MCC called, we will most likely not have physics beam until after 20:00
    17:48 Spectrometer moved successfully, techs exit the hall. Told MCC we
    are ready for beam
    17:55 MCC called, the detector hut door for the left spectrometer is not
    closed. Jack headed down to close the door.
    18:02 Door is shut, gone to power permit
    18:23 Back into the hall, bogies right not working again.
    18:51 Set HV to 72% of MAX
    19:30 Right Q2 tripped, Jack Segal was still around, so he is investigating.
    20:39 Can set Q2 by hand, but not remotely. Jack Segal is going
    downstairs to set the Q2 current manually.
    21:12 Current set manually. Back to beam permit.
    23:14 Called to ask about beam delivery -- crew chief will call back

    Run Summary

    Run Begin End Notes
    -----------------------------------

    no beam