User name Mina Kat
Log entry time 00:03:35 on May16,2007
Entry number 202189
keyword=Shift Summary
Continuing with Q2 = 45 fm-2, He3 running
Raster change: 25% increase in x direction and 20% decrease in y direction to match raster running conditions of previous Forward kinematic runs. (New raster size starts with run 3461)
17:10 MCC informs us that dump ion chamber limits permit us now to run at higher current (we were running at ~ 85 uA). Requested 105 uA.
18:00 MCC: beam off for approx 15-30 min for beam dispersion measurent for hall B.
18:20 beam back
18:50 MCC cannot give more current than 100 uA. Gun is beginning to
lose efficiency. They may have to do a spot change.
20:37 MCC takes beam away to fix frequent beam trip problem
20:46 beam back
Smooth running for the majority of this shift
Production Runs:
----------------
3459 1.25M
3460 0.33M Short good run to check new raster size (1st iteration)
3461 1.25M Run with new raster size (2nd iteration -final one)
3462 1.20M ended earlier beam off due to MCC tests for hall B
3463 1.2M
3464 1.2M
3465 1.15M
3466 1.25M
3467 1.1M
3468 0.5M ended run. MCC checks frequent trip problem
3469 1.25M
3470 1.25M
3471 1.25M
3472 1.25M
3473 1.25M
3474 1.25M
3475 1.25M
3476 1.25M
3477 in progress