• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name V. Sulkosky

    Log entry time 00:01:54 on May19,2007

    Entry number 202593

    keyword=Swing Shift Summary

    Shift Crew: Vincent Sulkosky (SL), Byungwuek Lee (TO)



    Major Events:

    -------------------------------------------------------------------------------

    16:00 Begin shift during energy change.

    16:23 Move target to BeO in preparation for beam.

    17:15 Moved Right spectrometer from 15.28 degs to 23.11 degs.

    17:20 Ed Folts has moved the left spectrometer from 140 degs to 120.76 degs.

    17:45 Nudged Right HRS angle to 23.122 degs.

    18:17 MCC called to give an updated. The estimate for tune beam in Hall A
    is 8:30 or 9 pm.

    18:20 Change Right HRS momentum from 0.6840 GeV/c to 0.6503 GeV/c. Quads were not
    cycled.

    18:22 Cycle Left HRS Q2 and Q3 to 1600 A.

    18:33 Change Left HRS momentum from 0.5753 GeV/c to 0.6101 GeV/c.

    19:42 MCC called. The beam dispersion is bad. They need to retune the beam.

    Probably another two hours are needed.

    21:35 MCC called and they are ready to bring us to beam permit and send tuned beam into Hall A.

    22:46 MCC called with an update. Finishing up the tune and RF separation.

    22:59 MCC is ready to send tuned beam to Hall A.