    Owl Shift Summary:

    M. Olson, Elena Kh.

    Run 3712 in progress at beginning of shift.
    No beam

    0011: Hall C went to 80uA, we are at 50uA
    0014: End run 3712 (928K) to adjust prescales for 50uA
    0034: End run 3713 (307K) to adjust prescales

    0117: End run 3714 (1.25M)

    0206: End run 3715 (1.25M)
    0234: End run 3716 (716k)
    Reset prescales for 80uA
    0240: End run 3717 to adjust prescales

    0326: End run 3718 (1.25M)
    Requested 90uA from MCC. Request granted
    Adjusted prescales

    0410: End run 3719 (1.25M)
    0456: End run 3720 (1.25M)
    Request -4% change in raster settings (was ~ 2.4 x 2.5 mm)

    0505: End run 3721 (358k)
    Requested another 4% reduction in y raster setting.
    Spot size returned to 2.3 X 2.3 mm

    0544: End run 3722 (1.25M)
    0546: End run 3723 to adjust prescales.

    0633: End run 3724 (1.25M)
    0640: Beam down (MCC reports problem with ioc's)
    End run 3725 (120k)

    0705: Beam returns, begin run 3726
    0742: End run 3726 (1.25M)

    Shift ends with run 3727 in progress.