    Shift Summary
    Day shift 5/23/07

    3727 07:43-08:21 3He production 90 microamps
    3728 08:21-08:30 3He production 90 microamps

    08:30 Beam off for energy change 4.479->4.137 4-pass
    going to opportunistic controlled access

    09:00 Hall is in Contolled Access waiting for the ARM survey

    09:04 spectrometers set to new kinematics
    Left: 3.622 GeV/c 23.960 deg
    Right: 0.835 GeV/c 62.318 deg
    (No quad cycling required. Right P0 stayed the same. Left went down)
    09:20 downloaded new trigger
    Left: E'=3622 (e's)
    Right: P_r=1670 (3He) (got a warning for this?)
    10:00 Techs go into the Hall
    10:35 Bob Michaels goes in the Hall
    10:45 Techs out of the Hall.
    12:00 Bob is out too.
    14:22 put IN BeO target

    Very quiet!