Main INDEX
Monthly INDEX
PREV
NEXT
User name LeRose
Log entry time 16:01:59 on May 23, 2007
Entry number 203065
keyword=Shift Summary
Shift Summary
Day shift 5/23/07
3727 07:43-08:21 3He production 90 microamps
3728 08:21-08:30 3He production 90 microamps
08:30 Beam off for energy change 4.479->4.137 4-pass
going to opportunistic controlled access
09:00 Hall is in Contolled Access waiting for the ARM survey
09:04 spectrometers set to new kinematics
Left: 3.622 GeV/c 23.960 deg
Right: 0.835 GeV/c 62.318 deg
(No quad cycling required. Right P0 stayed the same. Left went down)
09:20 downloaded new trigger
Left: E'=3622 (e's)
Right: P_r=1670 (3He) (got a warning for this?)
10:00 Techs go into the Hall
10:35 Bob Michaels goes in the Hall
10:45 Techs out of the Hall.
12:00 Bob is out too.
14:22 put IN BeO target
Very quiet!