    User name R. Michaels

    Log entry time 16:06:23 on May25,2007

    Entry number 203214

    keyword=day shift summary

    Started the shift with run 3753 dummy target.
    Did two useful production runs 3754 and 56.
    At 10:33 had downtime to fix a cryo problem in the hall.
    At noon we were down for an energy pass change in Hall C.
    At 13:45 we had another (different) cryo problem.

    At end of shift the magnets are nearly recovered (the
    dipoles are SLOW) and the beam is back at 90 uA.
    There are lots of trips at 100 uA but it's pretty
    stable at 90 uA.