Main INDEX
Monthly INDEX
PREV
NEXT
User name Holmstrom
Log entry time 16:01:08 on May30,2007
Entry number 203675
keyword=Day Shift Summary
8:00 Shift starts with data taking at 50 uA at Q2=24 fm-2
9:06 We start moving the sectrometers to Q2=34 fm-2 configuration
Left
p0=1.895 GeV
theta=33.2
Right
p0=0.5389 GeV
theta=65.046
9:08 MCC called they are going to start BCM calibration.
11:00 BCM calibration postponed.
12:35 Starting Production
14:52 Beam away for 1 hour for hall B beam tune
16:00 Shift end waiting for Hall B beam tune to end.
Run Time Q2 I #(M)
3881 7:58-8:28 24 50 1.25
3882 8:28-9:06 24 50 1.25(start of run had bad beam)
3883 Junk
3884 12:34-13:37 34 50 1.25
3885 Junk
3886 13:56-14:52 34 50 1.03