    16:00 Swing Shift Start
    Shift Workers Lindgren and Acha
    No Beam
    16:30 MCC Beam back at 50 ua
    16:35 Start Run 3887
    17:10 Stop Run 3887 0.75 Events
    Saha now setting up to conduct current calibration
    19:12 beam Current Calibration Finished
    Beam current set to 40 ua.
    19:14 Start dummy target Run 3895
    19:31 End Run Noticed that PS1 is not set right.
    19:32 Start Run 3896 with correct PS values.
    20:01 Moved HRS-L to 25 Deg and changed Field
    21:36 Start Run 3897
    22:31 Moved HRS to 22.5 deg and changed field
    23:00 Start Run 3908

    Runs Target Events
    3887 He4 0.75 M
    3388 He4 0.15 M
    3389 Junk Run
    3390 Junk Run
    3891 Dum 0.18 M
    3892 Dum 0.39 M
    3893 Empty Beam Current Calibration
    3894 Empty Meam Current Calibration
    3895 Dum 0.82 M
    3896 Dum 0.14 M
    3897 He4 0.17 M HRS-L = 25.0 Deg
    3898 He4 1.10 M HRS-L = 25.0 Deg
    3899 He4 1.03 M HRS-L = 25.0 Deg
    3900 Dum 0.10 M HRS-L = 25.0 Deg
    3901 Dum 0.10 M HRS-L = 25.0 Deg
    3902 Dum 0.20 M HRS-L = 25.0 Deg Collimator out
    3903 Dum 0.20 M HRS-L = 25.0 Deg Collimator out
    3904 Junk
    3905 He4 1.00 M HRS-L = 25.0 Deg Collimator out
    3906 He4 1.00 M HRS-L = 25.0 Deg Collimator out
    3907 Junk
    3908 He4 0.7 M HRS-L = 25.0 Deg Collimator in
    3909 He4 0.7 M HRS-L = 25.0 Deg Collimator in
    3910 He4 1.0 M HRS-L = 25.0 Deg Collimator out
    3911 Junk
    3912 Dum 0.4 M HRS-L = 25.0 Deg Collimator out
    Swing Shift ends
    New Configuration