User name Lindgren
Log entry time 00:14:13 on May31,2007
Entry number 203749
keyword=Shift Summary
16:00 Swing Shift Start
Shift Workers Lindgren and Acha
No Beam
16:30 MCC Beam back at 50 ua
16:35 Start Run 3887
17:10 Stop Run 3887 0.75 Events
Saha now setting up to conduct current calibration
19:12 beam Current Calibration Finished
Beam current set to 40 ua.
19:14 Start dummy target Run 3895
19:31 End Run Noticed that PS1 is not set right.
19:32 Start Run 3896 with correct PS values.
20:01 Moved HRS-L to 25 Deg and changed Field
21:36 Start Run 3897
22:31 Moved HRS to 22.5 deg and changed field
23:00 Start Run 3908
Runs Target Events
3887 He4 0.75 M
3388 He4 0.15 M
3389 Junk Run
3390 Junk Run
3891 Dum 0.18 M
3892 Dum 0.39 M
3893 Empty Beam Current Calibration
3894 Empty Meam Current Calibration
3895 Dum 0.82 M
3896 Dum 0.14 M
3897 He4 0.17 M HRS-L = 25.0 Deg
3898 He4 1.10 M HRS-L = 25.0 Deg
3899 He4 1.03 M HRS-L = 25.0 Deg
3900 Dum 0.10 M HRS-L = 25.0 Deg
3901 Dum 0.10 M HRS-L = 25.0 Deg
3902 Dum 0.20 M HRS-L = 25.0 Deg Collimator out
3903 Dum 0.20 M HRS-L = 25.0 Deg Collimator out
3904 Junk
3905 He4 1.00 M HRS-L = 25.0 Deg Collimator out
3906 He4 1.00 M HRS-L = 25.0 Deg Collimator out
3907 Junk
3908 He4 0.7 M HRS-L = 25.0 Deg Collimator in
3909 He4 0.7 M HRS-L = 25.0 Deg Collimator in
3910 He4 1.0 M HRS-L = 25.0 Deg Collimator out
3911 Junk
3912 Dum 0.4 M HRS-L = 25.0 Deg Collimator out
Swing Shift ends