    User name Eric Voutier

    Log entry time 08:01:34 on October25,2007

    Entry number 209551

    keyword=Shift Summary


    New crew on shift : Vince Sulkosky, Yi Zhang, Jian-Ping Chen,
    ----------------- Eric Voutier

    12:00 Continuing tuning, optics target in place

    12:50 Raster check, trying to calibrate spot++/MCC values
    (error on the measurments are +/- 0.2 mm)
    2x2 MCC 2.29 x 2.29 Delta-x = 1.3 mm Delta_y = 2.3 mm
    3x3 MCC 3.43 x 3.43 Delta-x = 1.6 mm Delta_y = 2.9 mm
    4x4 MCC 4.74 x 4.74 Delta-x = 1.8 mm Delta-y = 3.3 mm
    10x5 MCC 11,93 x 5.88 Delta-x = 4.0 mm Delta-y = 4.0 mm

    01:35 Moving the right spectrometer to 60 degres

    02:10 The spectrometer is in place, waiting for the momentum to
    stabilize, adjusting Hvs, raster size 5x2.5

    03:30 Start production data on Helium

    03:55 Moving to lead target

    05:20 moving to carbon target

    05:55 moving to iron target

    07:00 moving to helium target, changing to Pr = 0.98952 GeV/c

    07:40 The dipole is still stabilizing

    07:53 Start data taking on helium at the new momentum setting

    Run history
    -----------

    Run # 20121 detector check with optics target
    Run # 20122 raster check 2.29x2.29 MCC units
    Run # 20123 raster check 3.43x3.43 MCC units
    Run # 20124 junk
    Run # 20125 raster check 4.74x4.74 MCC units
    Run # 20126 raster check 11.93x5.88 MCC units
    Run # 20127 check raster size at 5.88 x 2.94
    Run # 20128 check for HVs

    #- Production data

    Run # 20129 Pr = 1.0613 GeV/c Target = Helium I = 6.6 uA
    Run # 20130 Pr = 1.0613 GeV/c Target = Hygrogen + Lead I = 2.6 uA
    beam position changes by about 3 mm during the run
    Run # 20131 Pr = 1.0613 GeV/c Target = Hygrogen + Lead I = 5.1 uA
    Run # 20132 Pr = 1.0613 GeV/c Target = Carbon_right I = 9.9 uA
    Run # 20133 Pr = 1.0613 GeV/c Target = Iron I = 5.3 uA
    Run # 20134 Pr = 0.9896 GeV/c Target = Helium I = 5.0 uA...