Main INDEX
Monthly INDEX
PREV
NEXT
User name Eric Voutier
Log entry time 08:01:34 on October25,2007
Entry number 209551
keyword=Shift Summary
New crew on shift : Vince Sulkosky, Yi Zhang, Jian-Ping Chen,
----------------- Eric Voutier
12:00 Continuing tuning, optics target in place
12:50 Raster check, trying to calibrate spot++/MCC values
(error on the measurments are +/- 0.2 mm)
2x2 MCC 2.29 x 2.29 Delta-x = 1.3 mm Delta_y = 2.3 mm
3x3 MCC 3.43 x 3.43 Delta-x = 1.6 mm Delta_y = 2.9 mm
4x4 MCC 4.74 x 4.74 Delta-x = 1.8 mm Delta-y = 3.3 mm
10x5 MCC 11,93 x 5.88 Delta-x = 4.0 mm Delta-y = 4.0 mm
01:35 Moving the right spectrometer to 60 degres
02:10 The spectrometer is in place, waiting for the momentum to
stabilize, adjusting Hvs, raster size 5x2.5
03:30 Start production data on Helium
03:55 Moving to lead target
05:20 moving to carbon target
05:55 moving to iron target
07:00 moving to helium target, changing to Pr = 0.98952 GeV/c
07:40 The dipole is still stabilizing
07:53 Start data taking on helium at the new momentum setting
Run history
-----------
Run # 20121 detector check with optics target
Run # 20122 raster check 2.29x2.29 MCC units
Run # 20123 raster check 3.43x3.43 MCC units
Run # 20124 junk
Run # 20125 raster check 4.74x4.74 MCC units
Run # 20126 raster check 11.93x5.88 MCC units
Run # 20127 check raster size at 5.88 x 2.94
Run # 20128 check for HVs
#- Production data
Run # 20129 Pr = 1.0613 GeV/c Target = Helium I = 6.6 uA
Run # 20130 Pr = 1.0613 GeV/c Target = Hygrogen + Lead I = 2.6 uA
beam position changes by about 3 mm during the run
Run # 20131 Pr = 1.0613 GeV/c Target = Hygrogen + Lead I = 5.1 uA
Run # 20132 Pr = 1.0613 GeV/c Target = Carbon_right I = 9.9 uA
Run # 20133 Pr = 1.0613 GeV/c Target = Iron I = 5.3 uA
Run # 20134 Pr = 0.9896 GeV/c Target = Helium I = 5.0 uA...