• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name Ramesh

    Log entry time 00:08:45 on October27,2007

    Entry number 209763

    keyword=Shift Summary


    Shift Crews: Kalyan, Eric, Ramesh
    -----------------

    17:23 Accelerator is having problems with the south linac. A vacuum
    valve closes and they cannot open it. Don't know at the moment
    wether it is an IOC to reboot or a manual opening to perform.

    19:56 MCC ready to deliver beam. Alex needs about 15 minutes to leave the hall (he was in controlled access).


    20:40 Ready to take beam. MCC is going to do Harp scan for us.

    21:01 Harps work. Trying to do Bull's eye scan.


    21:18 Bull's eye scan finished. This is the result:

    Desired_(x,y)...Coda_run_no...BPMA..(x,y)......BPMB..(x,y)...Harp_run
    -----------------------------------------------------------------
    (0,0)...........20148.........(0.485,-0.38)...(0.009,-0.023)..lHA1H03B.10262007_21:22

    (2,2)...........20149.........(2.041,2.160)...(1.998,2.009)..lHA1H03B.10262007_21:39

    (2,-2)..........20150.........(1.935,-2.04)...(2.003,-2.008)..lHA1H03B.10262007_22:01

    (-2,-2).........20151.........(-1.894,-2.347)...(-2.000,-2.004)..lHA1H03B.10262007_22:15

    Rest of the time:
    Taken optics target runs for NaI calibration.