Main INDEX
Monthly INDEX
PREV
NEXT
User name Z.E. Meziani
Log entry time 08:03:43 on October27,2007
Entry number 209848
keyword=shift summary
00:00 Shift begin
run # left 1283/ right 2155 Optics run
00:40 unplugged the DAQ SYNC cables
00:52 waiting for the Right dipole to settle to p=1.0963
before starting optics runs.
00:56 Changing the left arm momentum to p = 1.00 GeV
to cut the elastic from the acceptance.
Calibration run
01:14 right arm run # 20156 Optics 1M events Collimator Open
01:34 right arm run # 20157 Optics 1M events -Seive
01:49 Changing right arm momentum to 1.1292 (+3%) Seive in
02:32 start run # 20158--- 1 M
02:32 Changing left arm momentum to p=1.0963 (0%) Seive in
02:44 Optics with Sieve in run# 1292 1M events
3:13 run # 1293 Leftarm (0%) without Sieve p=1.0963
run # 20160 Rightarm (3%) without Sieve p = 1.1292 1M.
3:30 Changing momentum for the left and the right arm
Left arm p = 1.1292 (+3%)
Right arm p = 1.1128 (+1.5%)
Collimator open on both arms
Left arm run # 1294 (High Voltages for Cherenkov changed to 2000V)
Right arm run # 20161 600,000 events
3:58 Left arm run # 1295 (Cherenkov voltages at 2000V)
4:02 MCC called, No beam for few minutes problem with RF.
04:11 Sieves in both arms. Beam back at 20 micro Amps
Left arm run # 1296 + run 1297 -- 0.5 M + 0.5 M events
Right arm run # 20162 + run 20163 -- 0.5 M + 0.5 M events
04:47 Changed momenta on both arms/ Sieve Slits still in
Left Arm p = 1.1128 --> run # 1298 -- 1 M events
05:25 Right Arm p = 1.0799 --> run # 20164 1 M events
5:25 Collimator open in left arm
Left arm p = 1.1128 --> 1299 1 M events
5:38 Collimator open in both arms
Right arm p = 1.0799 -->run# 20165 ---> 1 M
Left arm p = 1.0799 --> run# 1300 ---> 1M events
Sieve slit in on left spectrometer.
Left arm p = 1.0799 --> run # 1301 --> 1 M events
Collimator out
Right arm p = 1.06342 --->run # 20166 ---> 1 M events
Collimator in/ Left arm p =1.06342 ----> run # 1302 ---> 1 M.
6:34 Right arm collimator in p= 1.06342 -->run # 20167--> 1M
6:38 Left arm collimator out p =1.0634-->run # 1303 --> 1M
6:49 Optics studies done.
Started the calibration of NaI on the left arm and moving the right arm to 60 deg.
07:46 Right arm angle set to 59.995 deg and
p= 1.06196 GeV/c, Raster on
Left arm p = 0.500 GeV/c for calibration
Target C12 Beam right
08:00 Shift End